Kitchen Sink Installation in Calgary

5.0· 100+ Google reviewsRed SealAlberta LicensedBBB Accredited

Sink installation in Calgary usually takes more than one trade. The countertop fabricator or installer cuts the opening and sets the sink, whoever is doing your cabinets looks after those, and we do the plumbing: the strainers and tailpieces, the trap to the drain in the wall, the hot and cold lines to the faucet, the dishwasher drain, and the garburator or reverse osmosis system if there's one to reconnect.

First, make sure a new sink is what's called for. If the sink is staying and only the faucet is changing, that's faucet installation. A sink in a bathroom vanity comes under bathroom plumbing. A kitchen sink that empties slowly needs drain cleaning, not a new sink, and water pooling in the cabinet with no obvious source calls for leak detection.

The quote is free. We check the cabinet, the wall drain and the water lines against the sink and faucet you've chosen, then give you a price. No work starts until you've accepted it.

We dispatch from both Calgary and Airdrie. Call 587-834-3668 to set up a quote, and if you're in Airdrie, Airdrie plumbing covers what else we take on there.

Drain, Trap and Water Lines Connected Under Your New Sink
Calgary + Airdrie
Dispatch bases
Red Seal
Journeyman plumbers
Licensed
& insured
Free
Quote

New counter and sink going in, or swapping the old sink out? Call 587-834-3668 and we'll tell you honestly when we can get there.

Call 587-834-3668
via Google

“I had my bathtub and AC fixed in one trip. Amazingly fast and friendly. Shaun was awesome”

Kyle Smith — verified Google review for FlameTech

Kyle Smith

Calgary · 1 year ago

What We Connect, and What the Counter Installer Does

A kitchen sink sits where two or three trades meet. Knowing where the line falls saves a second trip, and stops a piece of the job falling between people.

Our side of the line

Everything from each drain opening in the bowl down to the drain where it leaves the wall, and from the shutoffs up to the faucet. That covers the strainers, tailpieces, trap, supply lines, the dishwasher drain and anything else that connects to the sink's plumbing.

The counter and cabinet side

Cutting the sink opening, fixing an undermount sink to the underside of the counter and sealing it are the fabricator's or countertop installer's work. Resizing or rebuilding the cabinet isn't part of our work. If the cabinet has to change to suit the new sink, that's for your cabinet installer or contractor.

Order of work in a renovation

The counter goes on and the sink is set first, and the plumbing is connected once the sink is solidly in place. It still pays to have us look before the counter is ordered, so the wall drain and the lines can be checked against the new sink while changes are still easy.

A new sink in a counter that's staying

Swapping sinks without replacing the counter is simplest when the new sink fits the existing opening. If it needs the opening made larger or a different shape, that's a job for a countertop installer, and it's worth asking one whether your counter allows it before you buy the sink. When you call, tell us how the old sink is fitted and who is setting the new one, and we'll plan the plumbing around that.

Before the Counter Is Ordered

Most of what shapes the plumbing is decided when the counter is ordered. Kohler's Installation and Care Guide for its kitchen and bar sinks is a good example of what a manufacturer asks for, and it also says "Install the water supplies and drain piping according to the roughing-in information." It's one maker's guide. Follow the one that came with your sink.

Give the counter shop the sink model

Kohler's guide puts it plainly: "Provide your countertop manufacturer with your sink model number when ordering your countertop; ensure the correct cut-out template is used." An opening cut from the wrong template can't easily be put right, and the plumbing can't start until the sink sits properly.

Settle the faucet before the stone is drilled

On an undermount sink, the faucet holes are in the counter, so the faucet should be chosen before the counter is made. Have its spec sheet ready for the fabricator: it gives the number of holes and the size each one needs. If you're also choosing a new faucet, our faucet installation page covers what to look for.

Drop-in sinks and the faucet

For a sink that sits on top of the counter, Kohler's guide says: "For top-mount installations: If possible, install the faucet to the sink before installing the sink." It's far easier with the sink upside down on a bench than working up under it in a cabinet. If your new sink is a drop-in, settle with whoever is setting it when the faucet goes on, and tell us when you book.

Bowl depth and the wall drain

Measure from the cabinet floor up to the centre of the drain stub where it leaves the wall. Then measure from the cabinet floor to the underside of the counter and take off the bowl depth from the sink's spec sheet. That's roughly where the bottom of the bowl will sit. The strainer, tailpiece and trap all have to fit in the space between, with the trap still falling into the wall drain. If the gap looks tight, tell us before the counter arrives.

Double bowls and the garburator

On a double sink, decide which bowl the garburator will hang under before the counter is cut. The drain layout under both bowls is planned around that choice, and so is where the dishwasher hose connects. If a new unit is going in as well, see garburator installation.

Room in the cabinet

A reverse osmosis system needs space for its filters and storage tank, a garburator hangs below one bowl, and the dishwasher hose has to reach the sink drain. A deep sink takes height from all of them. If you have or are planning reverse osmosis, say so up front so the layout leaves room for it.

Drain, Trap and Dishwasher Connections

Everything below the bowls has to carry water down and out to the wall drain without a joint that weeps.

Strainers and tailpieces

Each bowl gets a basket strainer sealed into its drain opening, unless that bowl takes a garburator. A tailpiece drops from the strainer toward the trap, cut to the length the layout needs.

Two bowls, one drain

With two bowls side by side, the drains from each have to be brought together and carried to the trap. How that runs across the cabinet depends on where each bowl's drain sits, whether one of them has a garburator, and where the wall drain is.

The trap and the wall drain

The trap holds a small amount of water that stops sewer gas coming up into the kitchen, and its outlet joins the drain pipe in the wall. It has to line up with that pipe without forcing the joints, because a joint under strain is the one that starts to drip later.

The dishwasher drain

The dishwasher's drain hose usually connects into the sink drain, either at a fitting on the tailpiece or at the garburator's inlet. How the hose has to be routed, including how high it loops under the counter, is set out in the dishwasher's own installation instructions, and those are what we follow.

Keeping your garburator

A garburator that still works and suits the new layout can usually come off the old sink and go back on the new one. If it's hard-wired, a licensed electrician has to disconnect and reconnect that wiring, so it needs arranging around our visit. If the unit is due for replacement anyway, garburator installation covers that.

The Water Lines Feeding the Sink

The supply side rarely changes when the sink does. It's still worth a proper look while the cabinet is empty and easy to reach.

Shutoffs that let water past

The sink's two shutoffs are the first thing we turn. One that still lets water through when it's closed means shutting the house down at the main instead, and it will do the same to you next time. With nothing in the cabinet in the way, this is the easiest moment to change it. It's quoted separately, and it's your call.

Grey plastic coming up to the shutoffs

If the pipe feeding the shutoffs is grey plastic, it's probably Poly-B, which plenty of 1980s and 1990s houses around Calgary were plumbed with. A new sink leaves it exactly as it was. If you're wondering what swapping it out would mean, start with Poly-B replacement, and read Do I need to replace Poly-B? if you're undecided.

Dishwasher and RO branches

The dishwasher's water supply is often taken from under the sink, and a reverse osmosis system takes its feed from the cold line there as well. Both get reconnected, and each adds a fitting to check. If either branch has been patched together over the years, we'll point it out.

A drip that can't wait

If a shutoff, supply line or trap under your current sink is already leaking, it doesn't have to wait for the new sink. That's a repair on its own, covered under plumbing repairs.

Replacing a Sink, Adding One, or Moving It

Where the new sink goes decides how much of the plumbing changes, and whether the City needs to be involved.

Same place, same drain

The simplest kitchen sink installation puts the new sink where the old one was, on the same drain and the same water lines. A sink is a fixture, and the City of Calgary's homeowner plumbing permit page names "Replace existing faucets and fixtures." among the jobs exempt from a permit.

An island sink or a prep sink

A sink somewhere there's never been one needs new drain and water lines brought to it, and a way to vent the drain. The City's page also says: "A plumbing permit is required when a plumbing system is constructed, extended or altered." Moving the main sink along the counter, or adding a second one in an island, is the kind of change that sentence is about, and it has to be planned before the cabinets go in.

If you're not sure about a permit

The City's own advice on that page is: "If you're unsure if you need a permit, call the Planning Services Centre at 403-268-5311." Make that call before the work is booked, not after.

Condo suites

In an apartment-style condo, there may be no shutoff that isolates only your unit, and turning the water off further back can mean going through the property manager. Many buildings also want notice of renovation work, or limit when trades can be in a suite. Read your bylaws and talk to management before the counter is ordered.

How the job goes

Simple, honest, on your schedule.

In a renovation the plumbing is connected last, after the counter and sink are in. Swapping a sink in a counter that's staying has fewer people to line up.

01

Tell us about the kitchen

Give us the sink model and the faucet model. Let us know if the dishwasher empties into the sink drain, and whether a garburator, a reverse osmosis filter or anything else shares the cabinet. If the counter is being replaced, let us know who's making it.

02

A look at the cabinet, and a quote

We check the wall drain, the shutoffs and the lines feeding them, and compare all of it with the sink and faucet you've picked. You then have a quote to accept or turn down.

03

Counter and sink set by their installer

On a new counter, the fabricator or installer cuts the opening and mounts the sink. We connect once it's in and any sealant has had the time its maker calls for. If the old sink's plumbing needs disconnecting before the old counter comes off, mention it when you book.

04

Connected, run and leak-checked

The strainers, tailpieces, trap, supplies and dishwasher drain go on, along with anything else that ties into the sink. Then each bowl is filled and let go, the faucet runs hot and cold, and every joint is checked for drips before we pack up.

Service Area

Where we cover Calgary.

We dispatch from Calgary and Airdrie. Find your neighbourhood for area-specific notes on common builds, hard-water patterns, and the systems we see most.

Request Service

Get a free sink installation quote.

Tell us what's going on and our dispatch team will call you back with pricing and availability.

We call you back — urgent jobs, call us directlyWe never share or sell your info

Or call 587-834-3668 if it's urgent

When you're ready

Book a Red Seal plumber in Calgary.

Free estimates and upfront pricing, from local technicians who treat your home like their own.

Free estimate · No service charge for quotes · BBB Accredited